[Feb-2022] Microsoft MB-320 Dumps – Reduce Your Chance of Failure in MB-320 Exam [Q83-Q105]

Share

[Feb-2022] Microsoft MB-320 Dumps – Reduce Your Chance of Failure in MB-320 Exam

To help you achieve your ultimate goal, we suggest the actual Microsoft MB-320 dumps for your Microsoft Dynamics 365 Supply Chain Management, Manufacturing exam preparation to use as your guideline.

NEW QUESTION 83
Note: This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some questions sets might have more than one correct solutions, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.
A company implements Dynamics 365 Supply Chain Management for their Lean manufacturing environment.
There has been an engineering change to a fixed quantity product that is in production. This change will add an additional processing step as the second step. The existing version must be phased out and replaced by the new version.
You need to ensure that the engineering change takes affect at the end of the month.
Solution:
1.) Add a new version to the existing production flow. Set the expiration date to the end of the month.
2.) Create an activity for the new process step and add it in the proper sequence
3.) Create a Kanban rule that incorporates the new activity. Set the expiration date to the end of the month.
4.) Edit the existing Kanban rule. Set the expiration date to the end of the month. Specify the new Kanban rules as the replacement rule Does the solution meet the goal?

  • A. No
  • B. Yes

Answer: A

 

NEW QUESTION 84
You are the production planner for a manufacturing company.
After running operations scheduling for a production order, the following error message displays:

You need to identify the cause of the error.
Which two actions should you perform? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.

  • A. Navigate to the work calendar and view working times. Validate that there are working days created in the scheduled period.
  • B. Review the available resources for Operation 10. Navigate to the Resource form and validate whether there is a calendar assigned
  • C. Review the calendar for the resource to determine if it is expired.
  • D. Review the resource group assigned to Operation 10. Check to see if there is a calendar assigned and if the calendar is expired.

Answer: B,C

 

NEW QUESTION 85
You are building the Bill of materials (BOM) for a new production item. The new item has a subcomponent.
Subproduction orders for the subcomponent must be created when estimating production orders.
You need to configure the BOM line to generate subproduction orders.
Which BOM line type should you use?

  • A. Item
  • B. Vendor
  • C. Pegged supply
  • D. Phantom

Answer: C

Explanation:
Section: Create and manage production and lean orders
Explanation/Reference:
References:
https://docs.microsoft.com/en-us/dynamics365/unified-operations/supply-chain/production-control/bill-of- material-bom

 

NEW QUESTION 86
A company uses separate finished good item numbers for size variations of the same product.
The company wants to minimize the number of variously-sized items that are created.
You need to perform the setup to allow variants in size to the product master.
Which five actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Answer:

Explanation:

Explanation

 

NEW QUESTION 87
A company implements Dynamics 365 Supply Chain Management.
Due to increased demand and limited space in the work cell area for product L0050, you must subcontract overflow work to another company. You have the following requirements:
* Locate a warehouse at the subcontractor building.
* Support picking and shipping activity tracking.
* Associate costs of transporting materials between the locations in the cost of the finished product.
You need to modify the production flow.
Which three actions should you perform? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.

  • A. Create a resource and work cell resource group for the subcontractor
  • B. Modify the overflow work operation and associate it with the subcontractor
  • C. Create transfer activities and assign them to the subcontractor
  • D. Modify the overflow work activity and assign it to subcontractor
  • E. Create a new production flow version

Answer: A,C,D

Explanation:
Reference:
https://docs.microsoft.com/en-us/dynamics365/supply-chain/production-control/manage-subcontract-work-produ

 

NEW QUESTION 88
A company produces homeopathic lotions for pain relief and uses Dynamics 365 for Finance and Operations.
You have replaced the vendor of a product's active ingredient with a new vendor. The new vendor is supplying the ingredient at a higher concentration of 25 percent.
The previous vendor concentration was 15 percent. You are consistently running out of two of the complimentary ingredients.
You need to update the formula and ingredient settings to allow for better order planning.
What should you do?

  • A. Modify the target value of the attribute for the compensating ingredients
  • B. Modify the minimum and maximum value of the attribute for the active ingredient
  • C. Modify the factor value of the compensation principle
  • D. Modify the target value of the attribute for the active ingredient

Answer: C

Explanation:
Section: Create, process, and manage production batch orders

 

NEW QUESTION 89
A company produces various products using Process manufacturing.
The manufacturer makes two co-products from a formula and rarely produces the primary formula item. The costs of making the co-products are inflated. The manufacturer must update the costs of producing the co- products and change the formula to not produce the primary formula item.
You need to change the primary formula item type.
What should you do?

  • A. Change the cost of the primary formula item to zero and then recalculate the item cost
  • B. Change the primary formula item to use the planning item type
  • C. Associate the costs to produce by-products with the items
  • D. Change the production type to Bill of materials and recalculate the item cost

Answer: B

Explanation:
Section: Create, process, and manage production batch orders

 

NEW QUESTION 90
You are the product design manager for a computer manufacturer.
Your new laptop model is configurable. There are restrictions on which hardware components can be selected depending on the model. You create configuration groups for hardware and software.
You need to create a new laptop item number and configurations.
In which order should you perform the actions? To answer, move all actions from the list of actions to the answer area and arrange them in the correct order.

Answer:

Explanation:

Explanation

References:
https://docs.microsoft.com/en-us/dynamics365/unified-operations/supply-chain/pim/dimension-based-product-co

 

NEW QUESTION 91
You are a process engineer evaluating Lean vs. Discrete processing. You want to convert a Kanban item. This item has the following Lean setup:
* The setup uses a Lean schedule group with a throughput ratio = 2.
* The process activity tied to production flow has the following runtime activity times: time = 3 min, per quantity = 1.
* The work cell capacity has a model type of Throughput and an average throughput quantity of 60 per a capacity period of standard workday (8 hour day).
* The throughput is 10 per hour.
You need to set up a Discrete operation to mirror the item's production flow activity.

  • A. Create a route with a runtime = 1, a process quantity = 6, and the operation's hours/time = 1.
  • B. Create a route with a runtime = 1, a process quantity = 1, and the operation's hours/time = 0.0167 (e.g. 1 hour/ 60 minutes).
  • C. Create a route with a runtime = 6, a process quantity = 1, and the operation's hours/time = 1.
  • D. Create a route with a runtime = 1, a process quantity = 10, and the operation's "hours/time = 1.

Answer: D

Explanation:
Reference:
https://docs.microsoft.com/en-us/dynamics365/supply-chain/production-control/tasks/define-lean-schedule-group

 

NEW QUESTION 92
A company makes lubricants and greases used in the automotive industry.
They are planning to use Dynamics 365 Supply Chain Management to make products whose characteristics can be tracked throughout the production process and are associated with the packaged product.
You need to identify which production methodology to use.
Which production methodology should you use?

  • A. Lean manufacturing
  • B. Job shop manufacturing
  • C. Discrete manufacturing
  • D. Process manufacturing

Answer: D

 

NEW QUESTION 93
You are the product definition manager for a car manufacturing company. You set up and maintain the production configuration models used at the company.
You must build a new configuration model and include constraints in the model.
You need to determine which constraint type to use for each scenario.
Which constraint type should you use? To answer, drag the appropriate constraint types to the correct scenarios. Each constraint type may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

Explanation

Reference:
https://docs.microsoft.com/en-us/dynamics365/supply-chain/pim/build-product-configuration-model

 

NEW QUESTION 94
A company implements Dynamics 365 for Finance and Operations.
Production orders are generated for products directly from projects. You create the following production order:

Use the drop-down menus to select the answer choice that answers each question based on the information presented in the graphic. NOTE: Each correct selection is worth one point.

Answer:

Explanation:

Explanation

 

NEW QUESTION 95
A company that uses Lean manufacturing concepts to produce paper plates has redesigned the layout of the warehouse and production floor.
The company's production flow activities no longer match the tasks of the workers. Employees use paper and manual communication to complete the tasks.
You need to update the production flows to match their current processes by deactivating the obsolete production flows and creating new ones.
Which five actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Answer:

Explanation:

 

NEW QUESTION 96
Note: This question is part of series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.
A company produces and distributes seafood to supermarkets. During the manufacturing process, raw seafood is purchased, cleaned, and packaged into various-sized boxes. Each box may have a different weight.
Product is sold by the box and priced by the pound.
You need to ensure that you can perform transactions at the box level and record the net weight of goods shipped to a customer.
Solution: Set up the product as a catch weight item with batch control. Set the catch weight unit to box and the inventory unit to pounds.
Does the solution meet the goal?

  • A. No
  • B. Yes

Answer: A

Explanation:
Explanation/Reference:
https://docs.microsoft.com/en-us/dynamicsax-2012/appuser-itpro/about-catch-weight-items

 

NEW QUESTION 97
A company makes lubricants and greases used in the automotive industry. The company plans to implement Dynamics 365 for Finance and Operations. The system must meet the following requirements:
* Schedule the batch production of products.
* Plan for inventory fluctuations of ingredients that are used across different products.
* Schedule delivery of amounts of proprietary compounds used during production from vendors to keep production runs on schedule and eliminating excess stock on hand or delayed production.
The company is starting the initial setup of their Dynamics 365 environment.

Answer:

Explanation:

 

NEW QUESTION 98
You are a functional consultant for Contoso Entertainment System USA.
You need to configure the system to ensure that the production release to warehouse process either performed manually or via batch.
To complete this task, sign in to Dynamics 365 portal.

Answer:

Explanation:
See explanation below.
* Navigate to Production control > Setup > Production parameters.
* Configure the Production line release parameter to Release BOM and formula lines via a batch job or as a manual interaction.
Reference:
https://docs.microsoft.com/en-us/dynamics365/supply-chain/production-control/releasing-bom-and-formula-line

 

NEW QUESTION 99
You are the production supervisor at a manufacturing company. You are in the process of configuring the production control module and its parameters.
A company plans to use manufacturing execution. Bill of materials (BOM) item consumption must be generated when items are reported at the operation level.
You need to configure the Manufacturing execution production order defaults form to allow for back flushing on operations.
How should you set up Automatic BOM consumption? To answer, drag the appropriate setting to the correct targets. Each source may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

Explanation:
References:
https://docs.microsoft.com/en-us/dynamics365/unified-operations/supply-chain/production-control/production-parameters-manufacturing-execution

 

NEW QUESTION 100
A company implements Dynamics 365 for Finance and Operations. You must use functionality in the system for group production runs to prevent downtime and excessive cleaning of the machines on the production line.
You need to set up the system.
Which behaviors should you expect? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

 

NEW QUESTION 101
A company that uses Lean manufacturing concepts to produce paper plates has redesigned the layout of the warehouse and production floor.
The company's production flow activities no longer match the tasks of the workers. Employees use paper and manual communication to complete the tasks.
You need to update the production flows to match their current processes by deactivating the obsolete production flows and creating new ones.
Which five actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Answer:

Explanation:

Explanation

 

NEW QUESTION 102
A company produces homeopathic lotions for pain relief and uses Dynamics 365 for Finance and Operations. You have replaced the vendor of a product's active ingredient with a new vendor. The new vendor is supplying the ingredient at a higher concentration of 25 percent.
The previous vendor concentration was 15 percent. You are consistently running out of two of the complimentary ingredients.
You need to update the formula and ingredient settings to allow for better order planning.
What should you do?

  • A. Modify the target value of the attribute for the compensating ingredients
  • B. Modify the minimum and maximum value of the attribute for the active ingredient
  • C. Modify the factor value of the compensation principle
  • D. Modify the target value of the attribute for the active ingredient

Answer: C

 

NEW QUESTION 103
A manufacturing company is implementing Dynamics 365 Supply Chain Management. The company uses a standard costing model to value inventory.
During the setup of the system, all areas that impact the standard cost of the item must be configured correctly to calculate a complete standard cost by using routing, Bill of materials (BOM) and overhead burden.
You need to verify that all areas of the system are correctly configured.
Which object does NOT impact the standard cost of manufactured items?

  • A. cost categories
  • B. cost groups
  • C. BOM formula
  • D. item group

Answer: C

Explanation:
Explanation

 

NEW QUESTION 104
You maintain responsible resource calendars and production orders for a manufacturing company. All production resources use the same production calendar.
A machine in the facility is defective and must be closed for repairs for the next two days.
You need to configure the resource calendar to close the resource for production for the next two days.
What should you do?

  • A. Navigate to the resource. Change the calendar to closed on the resource.
  • B. Navigate to the resource group. Change the calendar to closed on the resource group.
  • C. Navigate to the resource and select Calendar deviations. Set the calendar to closed for the next two days.
  • D. Navigate to the calendar used for production and close the next two days.

Answer: C

 

NEW QUESTION 105
......

Accurate & Verified Answers As Seen in the Real Exam here: https://prep4sure.vcedumps.com/MB-320-examcollection.html